The total length is 39.4 kilometers, with 25 stations.
On the morning of August 29, 2025, Ningbo Rail Transit Line 7 began initial operations. Line 7 is 39.4 kilometers long, starting from Yunlong Station and ending at Yufan, all of which are underground stations, with a total of 25 stations, including 6 transfer stations. The trains consist of six-carriage B-type trains, with a maximum operating speed of up to 100 kilometers per hour.
The line is 37.4 kilometers long with 30 stations.
The rail journey from Thailand via Laos to China has been reduced.
The Civil Aviation Administration of China recently announced a new safety regulation that took effect on June 28th.