
The 100th transfer station of the Beijing Subway.
Starting from the first train on the morning of November 8th, Beijing Subway Line 8 Dahongmen Station opens. After opening, Line 8 Dahongmen Station and Line 10 Dahongmen Station will enable in-station transfers. With the opening of Line 8 Dahongmen Station, it also becomes the 100th transfer station of the Beijing Subway.

Wangjing West Transportation Hub officially opens.

The total length is about 30.8 kilometers, with 32 stations.

The total length is 81 kilometers, with a design speed of 250 kilometers per hour.